You are here: Home > Message Board > Palace Talk > New Main Stand
November 21 2024 12.35pm

This page is no longer updated, and is the old forum. For new topics visit the New HOL forum.

New Main Stand

Previous Topic | Next Topic


Page 27 of 35 < 23 24 25 26 27 28 29 30 31 >

  

eagleman13 Flag On The Road To Hell & Alicante 23 May 24 3.16pm Send a Private Message to eagleman13 Holmesdale Online Elite Member Add eagleman13 as a friend

Originally posted by Lawrie

Would be nice if we could offer a little prize/incentive to the first person to spot any sign of something happening.
The sight of an Irishman with a wheelbarrow, spade and a bag of cement would do. He he.

There won't be any 'irish' building the stand, it'll be all east europeans.

 


This operation, will make the 'Charge Of The Light Brigade' seem like a simple military exercise.

Alert Alert a moderator to this post Edit this post Quote this post in a reply
martin2412 Flag Living The Dream 23 May 24 7.14pm Send a Private Message to martin2412 Add martin2412 as a friend

Originally posted by eagleman13

There won't be any 'irish' building the stand, it'll be all east europeans.

Sasa Curcic & Sons Ltd put in the cheapest bid.

 

Alert Alert a moderator to this post Edit this post Quote this post in a reply
Paaalaaace Flag Croydon 23 May 24 11.09pm Send a Private Message to Paaalaaace Add Paaalaaace as a friend

Yep, spot on, it will be this time next year construction starts in earnest at the earliest.

Originally posted by Elpis

If it was happening this summer work should have started . As SP said there needs to be some prep work under the stand along with changing rooms being moved to under the Holmesdale .
I cant see them starting it without the funds in place along with extras just in case

Next year , maybe .

 

Alert Alert a moderator to this post Edit this post Quote this post in a reply
dreamwaverider Flag London 24 May 24 12.47am Send a Private Message to dreamwaverider Add dreamwaverider as a friend

Originally posted by Paaalaaace

Yep, spot on, it will be this time next year construction starts in earnest at the earliest.

I reckon it will take two years to build it and another two to have it approved. Just like Fulham, which still hasn't fully opened. I can't see them demolishing the old stand and fitting the seating in a summer close season. More like a whole season nowadays. So if we are lucky, this decade.

Edited by dreamwaverider (24 May 2024 12.48am)

 

Alert Alert a moderator to this post Edit this post Quote this post in a reply
ex hibitionist Flag Hastings 24 May 24 4.00pm Send a Private Message to ex hibitionist Add ex hibitionist as a friend

Originally posted by SnapperKain

I went on a stadium tour at Christmas and we talked about the new stand and the funding and assuming they weren't telling porky pies, the funding for the new stand and the funding for the squad are completely different and not connected.

not so much Tony Mowbray more Melton Mowbray I fear ... we should put Parrish on the spot about this, some petition demanding clarity, he's prob worked out if he gets his timing right we cam get £200mil for Olise, Eze and Wharton - plus 50 for Guehi, and if we can get replacements for the same price we bought those four we can have our new stand without the first team quality going down too much, but he'd want the cash in the bank first - the silence speaks volumes. Same the way he paid our debts and high wages with the Wan Bissaka sale.

 

Alert Alert a moderator to this post Edit this post Quote this post in a reply
ASCPFC Flag Pro-Cathedral/caravan park 24 May 24 4.34pm Send a Private Message to ASCPFC Add ASCPFC as a friend

Selhurst Park Living Football Museum - 2055. "This is what grounds used to be like and Crystal Palace still ply their trade in these hallowed and historic surroundings".

 


Red and Blue Army!

Alert Alert a moderator to this post Edit this post Quote this post in a reply
Yellow Card - User has been warned of conduct on the messageboards grumpymort Flag US/Thailand/UK 25 May 24 5.15pm Send a Private Message to grumpymort Add grumpymort as a friend

The stand needs to be complete before the next Euro in 2028.

To miss out on maybe being one of the grounds for that would be very poor.

Already many bad decisions but the positives I do believe it will happen just a case of when.

Our clubs is always behind and takes so long to do anything this has to be down to SP.

 


(VPN) - [Link]
(Alt VPN) - [Link]

Alert Alert a moderator to this post Edit this post Quote this post in a reply
Davepalace707 Flag Northumberland 25 May 24 10.00pm Send a Private Message to Davepalace707 Add Davepalace707 as a friend

Originally posted by grumpymort

The stand needs to be complete before the next Euro in 2028.

To miss out on maybe being one of the grounds for that would be very poor.

Already many bad decisions but the positives I do believe it will happen just a case of when.

Our clubs is always behind and takes so long to do anything this has to be down to SP.

40,853. That’s the capacity of Stamford Bridge and the smallest capacity of the nine teams we finished below. Presumably you think SP should have increased ours to that by now. Good luck finding an architect who can stick another 13,000 into Selhurst Park. Oh and we finished above every single club in the country with a smaller ground than Chelsea.

 

Alert Alert a moderator to this post Edit this post Quote this post in a reply
Dubai Eagle Flag 26 May 24 7.08am Send a Private Message to Dubai Eagle Add Dubai Eagle as a friend

On Page 3 of this thread SW19 has a broad strokes summary of the work involved & about 60% of the way down the page says that the work is expected to start sometime about now & take between 27-30 months.

Also on the ground capacity - When the earlier outline was released it was billed as a 2 stage development - stage 1 being ground capacity 25,400 increased to 33,000 (ish) with a second stage upgrade being possible as & when it was deemed appropriate to increase capacity to 40,000-

I would imagine that all efforts at the moment are going to be focussed on stage 1, (i.e) getting it built & the additional seats / corporate boxes sold to prove we can fill the ground before anyone gives any real efforts to any stage 2 development.

 

Alert Alert a moderator to this post Edit this post Quote this post in a reply
Adamoc123 Flag Ennis 26 May 24 7.46am Send a Private Message to Adamoc123 Add Adamoc123 as a friend

Originally posted by Lawrie

Would be nice if we could offer a little prize/incentive to the first person to spot any sign of something happening.
The sight of an Irishman with a wheelbarrow, spade and a bag of cement would do. He he.

I'll come over and do it for free just to get the ball rolling

 


The First 90 Minutes Are The Most Important!

Alert Alert a moderator to this post Edit this post Quote this post in a reply
Painter Flag Croydon 26 May 24 4.49pm Send a Private Message to Painter Add Painter as a friend

Originally posted by grumpymort

The stand needs to be complete before the next Euro in 2028.

To miss out on maybe being one of the grounds for that would be very poor.

Already many bad decisions but the positives I do believe it will happen just a case of when.

Our clubs is always behind and takes so long to do anything this has to be down to SP.

It doesn't matter what size it is, there no chance of ever being selected for Euros, as transport links are a nightmare.

You cant blame SP for that, no matter how you try.

 

Alert Alert a moderator to this post Edit this post Quote this post in a reply
Badger11 Flag Beckenham 26 May 24 6.08pm Send a Private Message to Badger11 Add Badger11 as a friend

Originally posted by Painter

It doesn't matter what size it is, there no chance of ever being selected for Euros, as transport links are a nightmare.

You cant blame SP for that, no matter how you try.

Bit of a tough call for UEFA. Wembley, Spurs, Arsenal, Chelsea (when it's rebuit) or little ol Palace.

 


One more point

Alert Alert a moderator to this post Edit this post Quote this post in a reply

  

Page 27 of 35 < 23 24 25 26 27 28 29 30 31 >

Previous Topic | Next Topic

You are here: Home > Message Board > Palace Talk > New Main Stand